Practical Flexible Flow Line Scheduling Problem with Sequence Dependent Setup Times
dc.contributor.author | Gohari, S. | |
dc.contributor.author | Shan, Xiaojun | |
dc.contributor.author | Khasawneh, M. T. | |
dc.date.accessioned | 2019-11-19T16:07:57Z | |
dc.date.available | 2019-11-19T16:07:57Z | |
dc.date.issued | 2016-05-21 | |
dc.description.abstract | Abstract not available. | en_US |
dc.identifier.citation | Gohari S., X. Shan, and M. T. Khasawneh, “Practical Flexible Flow Line Scheduling Problem with Sequence Dependent Setup Times”, the Institute of Industrial and Systems Engineer (IISE) Annual Conference and Expo 2016, Anaheim, CA, May 21-24, 2016. | en_US |
dc.identifier.uri | https://hdl.handle.net/10657.1/1694 | |
dc.publisher | The Institute of Industrial and Systems engineer (IISE) | en_US |
dc.title | Practical Flexible Flow Line Scheduling Problem with Sequence Dependent Setup Times | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- not-available.jpg.jpg
- Size:
- 2.97 KB
- Format:
- Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
- Description:
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: