Gohari, S.Shan, XiaojunKhasawneh, M. T.2019-11-192019-11-192016-05-21Gohari S., X. Shan, and M. T. Khasawneh, “Practical Flexible Flow Line Scheduling Problem with Sequence Dependent Setup Times”, the Institute of Industrial and Systems Engineer (IISE) Annual Conference and Expo 2016, Anaheim, CA, May 21-24, 2016.https://hdl.handle.net/10657.1/1694Abstract not available.Practical Flexible Flow Line Scheduling Problem with Sequence Dependent Setup Times