Practical Flexible Flow Line Scheduling Problem with Sequence Dependent Setup Times
Date
2016-05-21
Authors
Gohari, S.
Shan, Xiaojun
Khasawneh, M. T.
Journal Title
Journal ISSN
Volume Title
Publisher
The Institute of Industrial and Systems engineer (IISE)
Abstract
Abstract not available.
Description
Keywords
Citation
Gohari S., X. Shan, and M. T. Khasawneh, “Practical Flexible Flow Line Scheduling Problem with Sequence Dependent Setup Times”, the Institute of Industrial and Systems Engineer (IISE) Annual Conference and Expo 2016, Anaheim, CA, May 21-24, 2016.